Turingnex Factory — Wire Processing Equipment Designed, Built & Tested in Dongguan
Designed, built and 100% run-in tested in our own Dongguan factory since 2008. We welcome factory tours and live video audits with our production team.
Shop Floor — Six Production Zones

The workshop is divided into six colour-coded zones, one per process. Each zone is kept to 5S standards, and every machine is assembled, run-in tested and packed in its own area before shipment.
- Machines built zone by zone, never mixed on one line
- Yellow-line walkways keep assembly and QC areas separate
- Pull-force test and 100% run-in test in the QC zone
Terminal Crimping Zone
Terminal crimping machines and crimping dies — full-auto, half-auto and bench presses.
Wire Stripping Zone
Stripping and cutting machines for single-core, multi-core and flat cable.
Automatic Taping Zone
Automatic taping machines for harness bundling and protection.
Cable Tying Zone
Nylon cable tie machines and final harness assembly.
Quality Control Zone
Pull-force testing and the 100% run-in test every machine passes.
Warehouse & Shipping Zone
Finished-machine storage and export packing for sea, air or express.
Zone 01 — Automated Harness Processing Lines
Fully automatic harness-processing machines — double-end crimping, housing insertion and multi-module lines — are assembled row by row in the Terminal Crimping Zone.
- Multi-module automated lines built and integrated on the floor
- Wiring and pneumatic circuits checked before run-in
- 100% run-in tested with sample terminals before dispatch


Zone 02 — Stripping & Cutting Assembly
Stripping and cutting machines are assembled on multi-station benches in the Wire Stripping Zone. Each unit is wired and verified against the circuit drawings before it moves to the function-test bench.
- Multi-station parallel assembly benches
- Wiring checked against circuit drawings
- Passed to function test with sample cable before packing
In-House Tooling & Machining
Crimping dies and precision parts are machined in-house on CNC vertical machining centres — tooling is matched to each machine, with no third-party outsourcing for standard work.
- Custom dies quoted per terminal drawing, MOQ from 1 piece
- Typically 5–10 days standard lead time after drawing approval
- A test video with your terminal is provided on request


Customer Showroom — See Machines Running
A selection of machines is on display in our showroom for live inspection and demonstration. Bring your wire and terminals and we can run a free trial on the machine you are considering.
- Live inspection and demos before you order
- Free trial with your own wire and terminals
- Video walkthrough if you can't visit in person
How a Machine Is Built, Tested & Packed
Every component is checked against spec on arrival, then each machine moves through the same three gates below — photographed on our shop floor. You can watch your own machine at any stage.

Assembly & wiring
Machines are assembled station by station by skilled technicians; wiring is verified against the circuit drawings.

Function test
Every machine is run with sample wire and terminals before packing — crimp force, strip length and cycle time are checked.

Export packing
Finished machines are film-wrapped and protected for sea, air or express shipping — with QC photos sent before packing.
Quality & Compliance
- CE certification — certificates available on request
- ISO9001 quality management system in place
- 100% factory run-in tested before shipment
- QC photos/videos sent before packing
- Export packing for sea / air / express
Certificates — Download & Verify
Issued CE certificates and test reports for the wire stripping range and the terminal crimping range. ISO9001 documentation is provided with quotations on request.
The R&D Team Behind the Machines
Sixteen R&D engineers design every machine and die in-house — electronics, motion control, wiring layouts and the crimp tooling used on our own floor. R&D Group 1, photographed at the factory in Dongguan.

R&D Group 1, Dongguan — design, electronics and control engineering.
Can't Fly to Dongguan? Do a Video Audit
Many buyers audit our factory before their first order — on-site or over a scheduled live video call. During production we can walk you around the bench, show your machine mid-assembly, and run the trial test live with your own wire and terminals.
Plan Your Factory Visit
From first message to running trial — a typical visit or remote audit takes four steps.
Contact us
Send your wire range, terminals and preferred dates via the contact form or WhatsApp.
We schedule
We arrange a time for an on-site visit or a live video audit with our production team.
Walk the floor
See assembly, the run-in test bench and export packing — or watch your own machine being built and tested.
Trial on your material
Bring or send your wire and terminals: we run a free trial and record the result before you commit.
Ask Before You Order
What is your MOQ?
MOQ is 1 machine for standard models — you can trial a single unit on one line before scaling. Custom dies are ordered by piece.
What is the typical lead time?
Common standard models are in stock and can ship right away; customised (non-standard) machines are built to order in 7–15 days. Dies and lead time are confirmed in the quotation.
What certifications do you have?
Our factory holds CE certification and ISO9001 quality management, and orders can be protected by Alibaba Trade Assurance. Certificates are available on request.
Do you offer free samples or trials?
Yes. Send your wire and terminals and we will arrange a free crimp test or trial — you verify quality before committing.
Can you supply 110V machines?
Yes — 110V / 220V / 380V configurations are available. Confirm your voltage at inquiry and we will quote accordingly.
How do you ship internationally?
We ship worldwide by sea, air or express with export-grade packing. Shipping cost and time depend on destination and machine size.
Can I visit the factory or check my machine during production?
We welcome factory tours and video calls with our production team. QC photos and videos of your machine are sent before packing, and you can join a live video call during assembly.
What QC documents do you provide?
CE certificates (MD / LVD / EMC) and test reports are available on request together with per-machine test records — ask via the contact form or RFQ.
What We Commit
- MOQ from 1 machine — trial one unit on a single line first
- Free crimp test on your wire and terminals before you order
- Standard models in stock — customised machines 7–15 days
- 12-month warranty with spare parts and remote support
